Prime News Ghana

Ghana to build second gas processing plant to boost energy security

By Vincent Ashitey
Shares
facebook sharing button Share
twitter sharing button Tweet
email sharing button Email
sharethis sharing button Share

Government has approved the immediate construction of a second gas processing plant as part of efforts to enhance energy security and mitigate supply shortfalls, Energy and Green Transition Minister John Jinapor announced on Friday.

Speaking at a post-Cabinet briefing at Jubilee House, Mr. Jinapor said the decision aligns with a broader strategy to stabilise the country’s energy sector over the short, medium, and long term.

“Cabinet has approved a raft of measures aimed at addressing the current situation comprehensively. In collaboration with the Finance Ministry, we will take immediate steps to construct a second gas processing plant to strengthen supply security and bridge shortfalls,” he said.

The minister sought to downplay growing public concern over intermittent power disruptions, dismissing calls for a formal load-shedding timetable.

“Let me be clear: we are not shedding load. The demand for a published load-shedding timetable is unfounded. If there is no load shedding, there is no need for a timetable,” he stated.

Mr. Jinapor further argued that Ghana continues to export approximately 300 megawatts of electricity to neighbouring countries, including Burkina Faso and Benin, contradicting claims of a severe power crisis.

The move to expand gas processing capacity reflects Ghana’s broader ambition to strengthen its domestic energy infrastructure and ensure long-term supply resilience amid fluctuating global energy markets.