Prime News Ghana

KIA Terminal 3 has 513 defects – Aviation Minister reveals

By Justice Kofi Bimpeh
Terminal 3
Terminal 3
Shares
facebook sharing button Share
twitter sharing button Tweet
email sharing button Email
sharethis sharing button Share

Aviation Minister Kofi Adda says the popular terminal 3 of the Kotoka International Airport (KIA) has 513 defects.

According to him, the ministry is still working with the Ghana Airports company to fix the defects in order to enhance the status of the facility.

Speaking to Bola Ray on Starr FM on Wednesday, the Navrongo Central MP said although the construction of terminal 3 is commendable, a lot of things could have been done differently.

READ ALSO: Work begins at KIA Terminal 3 to fix poor drainage systems

 “Of course the initiative is commendable, as to whether the implementation was right is also another thing. As of the time we took over, we detected over 500 defects in the terminal 3. In fact, at the last count, we had 513 defects, and these are things we are still working to fix,” he said.

The Terminal 3 constructed by the erstwhile Mahama administration became fully operational on September 15, 2018, following the completion of tests and simulation exercises.

READ ALSO: Increase in passenger numbers after the construction of KIA Terminal 3 - Aviation Authority reveals 

The $250 million T3 projects partly funded by the African Development Bank is to ease pressure on the existing two terminals expected to handle up to five million passengers a year, with expansion potential of up to 6.5 million passengers.

The new terminal comprises of five levels spread across an area of 48,268m² and semiclosed areas for the Baggage Make-up Areas of 28,260m², Ultra Modern facilities and capacity to handle 5 million passengers a year; capacity to process 1,250 passengers per hour; six boarding bridges; 7 links (expandable to 8 in the future); Large retail area (7000m²), CIP terminal and 707 Car parking slots and a new road network.